A B C D E F
1 Wastewater Flow Monitoring Services RFP-5860-26-KF  
2 Appendix 2 —Sanitary Sewer Flow Monitoring Price Proposal Spreadsheet    
3            
4 Task Description Unit Quantity Unit Price Total
5 1 Flow Meter Installation/Removal Each 7   $0.00
6 2 Rain Gauge Installation/Removal Each 1   $0.00
7 3 Flow Meter Maintenance and Data Collection Per Meter Per Week 70   $0.00
8 4 Technical Memorandum Each 2   $0.00
9   Total Cost       $0.00
10            
11 Prices include all labor, materials, equipment, and incidentals necessary to perform the Base Services in accordance with the RFP
12            
13            
14   On-Call Services        
15 On-call services shall be performed only upon written authorization by the City.    
16 The Consultant shall submit a cost estimate for each on-call scope of work based on the contract unit rates
17 and/or on-call rates approved under the Contract.        
18            
19 Traffic Control Costs, if required, shall be reimbursed as pass-through costs at actual costs without markup.
20            
21 Prices shall remain firm through execution of the Contract, and any authorized renewal periods
22            
23
Total Cost $
       
24            
25 Written:         Dollars.
26  
       
27 Entity Name:        
28            
29 Autorized Representative:        
30  
       
31
Title:
         
32            
33 Signature:        
34            
35
Date:
         
36            

Sheet1