| |
A |
B |
C |
D |
E |
F |
|---|
| 1 |
Wastewater Flow Monitoring Services RFP-5860-26-KF |
|
| 2 |
Appendix 2 —Sanitary Sewer Flow Monitoring Price Proposal Spreadsheet
|
|
|
| 3 |
|
|
|
|
|
|
| 4 |
Task |
Description |
Unit |
Quantity |
Unit Price |
Total |
| 5 |
1 |
Flow Meter Installation/Removal |
Each |
7 |
|
$0.00 |
| 6 |
2 |
Rain Gauge Installation/Removal |
Each |
1 |
|
$0.00 |
| 7 |
3 |
Flow Meter Maintenance and Data Collection |
Per Meter Per Week |
70 |
|
$0.00 |
| 8 |
4 |
Technical Memorandum |
Each |
2 |
|
$0.00 |
| 9 |
|
Total Cost |
|
|
|
$0.00 |
| 10 |
|
|
|
|
|
|
| 11 |
Prices include all labor, materials, equipment, and incidentals
necessary to perform the Base Services in accordance with the
RFP |
| 12 |
|
|
|
|
|
|
| 13 |
|
|
|
|
|
|
| 14 |
|
On-Call Services |
|
|
|
|
| 15 |
On-call services shall be performed only upon written authorization
by the City. |
|
|
| 16 |
The Consultant shall submit a cost estimate for each on-call
scope of work based on the contract unit rates |
| 17 |
and/or on-call rates approved under the Contract. |
|
|
|
|
| 18 |
|
|
|
|
|
|
| 19 |
Traffic Control Costs, if required, shall be reimbursed as pass-through
costs at actual costs without markup. |
| 20 |
|
|
|
|
|
|
| 21 |
Prices shall remain firm through execution of the Contract, and
any authorized renewal periods |
| 22 |
|
|
|
|
|
|
| 23 |
Total Cost $ |
|
|
|
|
| 24 |
|
|
|
|
|
|
| 25 |
Written: |
|
|
|
|
Dollars. |
| 26 |
|
|
|
|
|
|
| 27 |
Entity Name: |
|
|
|
|
| 28 |
|
|
|
|
|
|
| 29 |
Autorized Representative: |
|
|
|
|
| 30 |
|
|
|
|
|
|
| 31 |
Title: |
|
|
|
|
|
| 32 |
|
|
|
|
|
|
| 33 |
Signature: |
|
|
|
|
| 34 |
|
|
|
|
|
|
| 35 |
Date: |
|
|
|
|
|
| 36 |
|
|
|
|
|
|