A B C D E
1 Addendum 1 Attachment A – Pricing Table      
2 RFP-5869-26-KF On-Demand Traffic Control Services    
3          
4 Alternative Pricing Models: Proposers may submit alternative pricing models (e.g., per-event, flat-rate, or bundled pricing
5 such as for Market on Main), provided such pricing is all-inclusive, clearly defined, and fully consistent with the
6 requirements of the Contract.        
7          
8 ALL PRICES MUST BE ALL-INCLUSIVE (Initial Contract Term and Up to Three (3) One-Year Renewal Terms
9 Unit rates shall include all costs necessary to provide the services, including, without limitation: labor, supervision, equipment, devices,
10 materials, tools, mobilization/demobilization, overhead, insurance, permits, fuel, administrative charges, and any other direct or indirect
11 costs.        
12          
13 Proposer may add labor classifications, equipment, devices, or services by inserting rows only within the blank rows provided at the
14 end of each section. Do not insert rows within existing listed items. Column structure, formulas, headers, and worksheet format shall not
15 be modified.        
16 CATEGORY 1 — CONSTRUCTION, CAPITAL IMPROVEMENT, AND OPERATIONAL MAINTENANCE TRAFFIC CONTROL
17 Proposer is bidding this category: ☐ Yes ☐ No    
18 A. Labor Rates — Construction, Capital Improvement, and Operational Maintenance Activities  
19 Classification Unit Regular Hours
Rate
After Hours
Rate
Weekend or Holiday
Rate
20 Traffic Control Supervisor Per Hour      
21 Flagger Per Hour      
25 B. Equipment & Devices — Construction, Capital Improvement, and Operational Maintenance Activities
26 Provide daily or per-use rate; specify method.      
27 Device/Equipment Unit Rate Comments  
28 Cones        
29 Drums (w/ lights)        
30 Vertical Panels (w/ lights)        
31 Type I/II Barricades        
32 Type III Barricades        
33 Pedestrian Fence        
34 Arrow Board        
35 VMS Board        
36 Signs        
37 Water Barrier "as-needed"        
41 C. Special Services — Construction, Capital Improvement, and Operational Maintenance Activities  
42 Service Unit Rate Comments  
43 Mobilization (within City limits)
Define: Per trip, Per day, Per project in comments
       
44 Mobilization (outside City limits)        
45 Traffic Control Plan —
Standard: define timeline in comments
       
46 Traffic Control Plan —
Expedited: define timeline in comments
       
47 CDOT coordination rate (if separate)        
49 D. Cost Efficiency Options — Construction, Capital Improvement, and Operational Maintenance Activities
50 Proposer must list any available cost-saving measures.    
54 CATEGORY 2 — EVENTS & SPECIAL ACTIVITIES TRAFFIC CONTROL  
55 Proposer is bidding this category: ☐ Yes ☐ No    
56 A. Labor Rates — Events and Special Activities      
57 Classification Unit Regular Hours
Rate
After Hours
Rate
Weekend or Holiday
Rate
58 Traffic Control Supervisor Per Hour      
59 Flagger Per Hour      
63 B. Equipment & Devices — Events and Special Activities    
64 Provide daily or per-use rate; specify method.      
65 Device/Equipment Unit Rate Comments  
66 Pedestrian Fence (7’)        
67 Orange Plastic Fencing        
68 Type III Barricades        
69 Cones/Drums/Vertical Panels        
70 VMS Boards        
71 Arrow Boards        
72 Signs        
76 C. Special Services — Events and Special Activities    
77 Service Unit Rate All Inclusive Pricing — Comments  
78 Mobilization
Define: Per event, or setup and tear down seperately in comments
       
79 Traffic Control Plan —
Standard: define timeline in comments
       
80 Parade / Festival full-route setup        
84 D. Cost Efficiency Options — Miscellaneous Events    
85 Miscellaneous Events — Unit Pricing
Per Event
Flat/Bundled Rate All Inclusive Pricing — Comments  
86 Junior College Baseball World Series
(JUCO) - end of May
       
87 Parks and Recreation
Fourth of July Fireworks at Lincoln Park
       
93 Proposer must list any available cost-saving measures. Proposers must describe below.  
98 CATEGORY 3 — EMERGENCY AND UNSCHEDULED RESPONSE    
99 Proposer is bidding this category: ☐ Yes ☐ No    
100 A. Labor Rates — Emergency        
101 Classification Unit Regular Hours
Rate
After Hours
Rate
Weekend or Holiday
Rate
102 Traffic Control Supervisor Per Hour      
103 Flagger Per Hour      
107 B. Equipment & Devices — Emergency      
108 Provide daily or per-use rate; specify method.      
109 Device/Equipment Unit Rate Comments  
110 Cones        
111 Drums (w/ lights)        
112 Vertical Panels (w/ lights)        
113 Type I/II Barricades        
114 Type III Barricades        
115 Pedestrian Fence        
116 Arrow Board        
117 VMS Board        
118 Signs        
121 C. Emergency Deployment Services        
122 Service Unit Regular Hours
Rate
After Hours
Rate
Weekend or Holiday
Rate
123 Emergency Mobilization
30-minute Response Requirement
Priced per incident
       
124 Road Closure (including detour)        
125 Emergency TCP (if required)        
130 Emergency mobilization pricing shall include dispatch, travel, and initial site setup. Travel time shall not be separately.
131 D. Cost Efficiency Options — Emergencies      
135 Additional Rates or Services Not Otherwise Captured in Categories 1–3  
136 This section is intended only for services, labor classifications, or equipment not reasonably included within Categories 1–3.
137 Classification/Service Unit Regular Hourly Nightly Hourly Weekend or Holiday
143 Information listed in this section shall not duplicate or restate any line item included elsewhere in this Pricing Table.
144          
145 Rates not included in this Pricing Table shall be deemed included in the Proposer’s base pricing and will not be separately compensated.
147 Certification: I hereby certify that the prices quoted above are complete and inclusive of all costs necessary to perform the required
148 services as specified in the RFP.        
149 Entity Name: ____________________________      
150 Authorized Representative Name: ____________________________    
151 Title: ____________________________        
152 Signature: ____________________________   Date: ____________________  

Sheet1