A | B | C | D | E | F | G | H | I | |
---|---|---|---|---|---|---|---|---|---|
1 | Bid Schedule | ||||||||
2 | NORTH AVENUE COMPLETE STREETS (12th Street to 23rd Street) | ||||||||
3 | IFB-4156-16-DH | ||||||||
5 | Instructions to Bidders: | ||||||||
6 | 1) | Four separate bid schedules are provided for this project. The Bidder must submit a bid for each schedule. Review Plans to understand full scope of the Project. | |||||||
7 | 2) | Insert company name where indicated on Sheet "Bid Sch_Base." | |||||||
8 | 3) | Bidder must provide a unit price for each item in all four schedules. | |||||||
9 | 4) | Provide the Disadvantaged Business Entity (DBE) commitment amount for each bid schedule on the Bid Summary tab. If the DBE commitment amount is zero for a given schedule, enter "0" in the appropriate location. | |||||||
10 | 5) | Review all unit prices carefully. | |||||||
11 | 6) | When all schedules are completed save spreadsheet with Company name inserted in the file name as follows: | |||||||
12 | a) | Click File Menu → Save As | |||||||
13 | b) | When the Save As window pops up, type NACS_19365_Add Alternate Bid Schedule_(COMPANY NAME HERE) in the File Name prompt. Be sure to replace (COMPANY NAME HERE) with the name of your company before saving. | |||||||
14 | c) | Click Save, or press Enter. | |||||||
15 | 7) | Submit the electronic file with company name in title, containing all unit prices along with all other required bid documents. | |||||||
17 | Notes: | ||||||||
18 | 1) | Failure to include a unit bid price for all items in every schedule will result in rejection of the Bidder's proposal. | |||||||
19 | 2) | Some bid items appear in multiple schedules as needed per project scope. Unit Prices may vary for similar Item Numbers on different schedules. | |||||||
20 | 3) | The Bid Summary sheet is for review purposes only. |
A | B | C | D | E | F | G | |
---|---|---|---|---|---|---|---|
1 | Bid Schedule | ||||||
2 | NORTH AVENUE COMPLETE STREETS (12th Street to 23rd Street) | ||||||
3 | IFB-4156-16-DH | ||||||
5 | Company: | ||||||
7 | Base Project - North Side and VA Improvements | ||||||
8 | Item No. | CDOT, City Ref. | Description | Quantity | Units | Unit Price | Total Price |
10 | 1 | 201-00000 | Clearing and Grubbing | 0.20 | AC | $ ____________ | $ ____________ |
11 | 2 | 202-00001 | Removal of Structure | 13.00 | EA | $ ____________ | $ ____________ |
12 | 3 | 202-00010 | Removal of Tree | 6.00 | EA | $ ____________ | $ ____________ |
13 | 4 | 202-00019 | Removal of Inlet | 2.00 | EA | $ ____________ | $ ____________ |
14 | 5 | 202-00033 | Removal of Pipe | 24.00 | LF | $ ____________ | $ ____________ |
15 | 6 | 202-00155 | Removal of Wall | 7.00 | LF | $ ____________ | $ ____________ |
16 | 7 | 202-00190 | Removal of Concrete Median Cover Material | 61.00 | SY | $ ____________ | $ ____________ |
17 | 8 | 202-00195 | Removal of Median Cover | 61.00 | SY | $ ____________ | $ ____________ |
18 | 9 | 202-00200 | Removal of Sidewalk | 1,087.00 | SY | $ ____________ | $ ____________ |
19 | 10 | 202-00201 | Removal of Curb | 981.00 | LF | $ ____________ | $ ____________ |
20 | 11 | 202-00202 | Removal of Gutter | 375.00 | LF | $ ____________ | $ ____________ |
21 | 12 | 202-00203 | Removal of Curb and Gutter | 2,221.00 | LF | $ ____________ | $ ____________ |
22 | 13 | 202-00206 | Removal of Concrete Curb Ramp | 65.00 | SY | $ ____________ | $ ____________ |
23 | 14 | 202-00210 | Removal of Concrete Pavement | 1,050.00 | SY | $ ____________ | $ ____________ |
24 | 15 | 202-00220 | Removal of Asphalt Mat | 3,817.00 | SY | $ ____________ | $ ____________ |
25 | 16 | 202-00250 | Removal of Pavement Marking | 130.00 | SF | $ ____________ | $ ____________ |
26 | 17 | 202-00815 | Removal of Sign (Special) | 1.00 | EA | $ ____________ | $ ____________ |
27 | 18 | 202-00821 | Removal of Sign Panel | 1.00 | EA | $ ____________ | $ ____________ |
28 | 19 | 203-00010 | Unclassified Excavation (CIP) | 906.00 | CY | $ ____________ | $ ____________ |
29 | 20 | 203-01597 | Potholing | 24.00 | HOUR | $ ____________ | $ ____________ |
30 | 21 | 203-01622 | Sweeping | 18.00 | HOUR | $ ____________ | $ ____________ |
31 | 22 | 207-00210 | Stockpile Topsoil | 480.00 | CY | $ ____________ | $ ____________ |
32 | 23 | 208-00035 | Aggregate Bag | 6.00 | LF | $ ____________ | $ ____________ |
33 | 24 | 208-00045 | Concrete Washout Structure | 1.00 | EA | $ ____________ | $ ____________ |
34 | 25 | 208-00052 | Storm Drain Inlet Protection (Type 2) | 80.00 | LF | $ ____________ | $ ____________ |
35 | 26 | 208-00070 | Vehicle Tracking Pad | 1.00 | EA | $ ____________ | $ ____________ |
36 | 27 | 208-00103 | Removal and Disposal of Sediment (Labor) | 24.00 | HOUR | $ ____________ | $ ____________ |
37 | 28 | 208-00105 | Removal and Disposal of Sediment (Equipment) | 24.00 | HOUR | $ ____________ | $ ____________ |
38 | 29 | 208-00206 | Erosion Control Supervisor | 72.00 | DAY | $ ____________ | $ ____________ |
39 | 30 | 210-00050 | Reset Fire Hydrant | 5.00 | EA | $ ____________ | $ ____________ |
40 | 31 | 210-00065 | Reset Monument (Type 3a) | 2.00 | EA | $ ____________ | $ ____________ |
41 | 32 | 210-00810 | Reset Ground Sign | 3.00 | EA | $ ____________ | $ ____________ |
42 | 33 | 210-00815 | Reset Sign Panel | 10.00 | EA | $ ____________ | $ ____________ |
43 | 34 | 210-00827 | Reset Pull Box | 6.00 | EA | $ ____________ | $ ____________ |
44 | 35 | 210-01000 | Reset Fence | 460.00 | LF | $ ____________ | $ ____________ |
45 | 36 | 210-01000 | Reset Fence (Special) (Safety Screen) | 58.00 | LF | $ ____________ | $ ____________ |
46 | 37 | 210-04010 | Adjust Manhole | 3.00 | EA | $ ____________ | $ ____________ |
47 | 38 | 210-04020 | Modify Inlet | 3.00 | EA | $ ____________ | $ ____________ |
48 | 40 | 210-04060 | Adjust Water Meter | 8.00 | EA | $ ____________ | $ ____________ |
49 | 41 | 212-00032 | Soil Conditioning | 0.40 | AC | $ ____________ | $ ____________ |
50 | 42 | 207-00205 | Topsoil | 1,322.00 | CY | $ ____________ | $ ____________ |
51 | 43 | 212-00011 | Seeding Lawn | 0.02 | AC | $ ____________ | $ ____________ |
52 | 44 | 212-00040 | Soil Preparation Lawn | 0.02 | AC | $ ____________ | $ ____________ |
53 | 45 | 213-00065 | Inorganic Mulch | 165.00 | CY | $ ____________ | $ ____________ |
54 | 47 | 214-00145 | Plant Protection Fence | 160.00 | LF | $ ____________ | $ ____________ |
---|---|---|---|---|---|---|---|
55 | 48 | 214-00230 | Deciduous Tree (3 Inch Caliper) | 59.00 | EA | $ ____________ | $ ____________ |
56 | 49 | 214-00350 | Deciduous Shrub (5 Gallon Container) | 149.00 | EA | $ ____________ | $ ____________ |
57 | 50 | 214-00910 | Perennials (1 Gallon Container) | 12.00 | EA | $ ____________ | $ ____________ |
58 | 51 | 304-06000 | Aggregate Base Course (CL 6) | 1,468.00 | TON | $ ____________ | $ ____________ |
59 | 52 | 403-00720 | Hot Mix Asphalt (Patching) (Asphalt) | 17.00 | TON | $ ____________ | $ ____________ |
60 | 53 | 403-34742 | Hot Mix Asphalt (Grading SX)(75)(PG 64-22) | 150.00 | TON | $ ____________ | $ ____________ |
61 | 54 | 403-34771 | Hot Mix Asphalt (Grading SX)(75)(PG 76-28) | 40.00 | TON | $ ____________ | $ ____________ |
62 | 55 | 411-10255 | Emulsified Asphalt (Slow-Setting) | 100.00 | GAL | $ ____________ | $ ____________ |
63 | 56 | 412-00600 | Concrete Pavement (6 inch) | 270.00 | SY | $ ____________ | $ ____________ |
64 | 57 | 412-00800 | Concrete Pavement (8 inch) | 960.00 | SY | $ ____________ | $ ____________ |
65 | 58 | 514-00100 | Hand Rail | 32.00 | LF | $ ____________ | $ ____________ |
66 | 59 | 601-03000 | Concrete Class D (Wall) | 6.00 | CY | $ ____________ | $ ____________ |
67 | 60 | 601-40301 | Structural Concrete Coating | 100.00 | SF | $ ____________ | $ ____________ |
68 | 61 | 602-00020 | Reinforcing Steel (Epoxy Coated) | 270.00 | LB | $ ____________ | $ ____________ |
69 | 62 | 603-00120 | 12 Inch Non-Reinforced Concrete Pipe | 178.00 | LF | $ ____________ | $ ____________ |
70 | 63 | 603-50008 | 8 Inch Plastic Pipe | 65.00 | LF | $ ____________ | $ ____________ |
71 | 64 | 604-13006 | Inlet Type 13 (5 Foot) (Special) | 2.00 | EA | $ ____________ | $ ____________ |
72 | 65 | 604-00305 | Inlet Type C (5 Foot) | 6.00 | EA | $ ____________ | $ ____________ |
73 | 66 | 604-30005 | Manhole Slab Base (5 Foot) | 2.00 | EA | $ ____________ | $ ____________ |
74 | 67 | 608-00006 | Concrete Sidewalk (6 Inch) | 2,713.00 | SY | $ ____________ | $ ____________ |
75 | 68 | 608-00010 | Concrete Curb Ramp | 39.00 | SY | $ ____________ | $ ____________ |
76 | 69 | 609-20000 | Curb Type 2 (Section B) (Special) | 52.00 | LF | $ ____________ | $ ____________ |
77 | 70 | 609-20010 | Curb Type 2 (Section B) | 1,258.00 | LF | $ ____________ | $ ____________ |
78 | 71 | 609-21010 | Curb and Gutter Type 2 (Section I-B) | 340.00 | LF | $ ____________ | $ ____________ |
79 | 72 | 609-21020 | Curb and Gutter Type 2 (Section II-B) | 1,910.00 | LF | $ ____________ | $ ____________ |
80 | 73 | 609-21900 | Curb and Gutter Type 2 (Section II-B) (Special) | 190.00 | LF | $ ____________ | $ ____________ |
81 | 75 | 613-01200 | 2 inch Electrical Conduit | 4,112.00 | LF | $ ____________ | $ ____________ |
82 | 76 | 613-04010 | Conduit (4" Broadband) | 7,600.00 | LF | $ ____________ | $ ____________ |
83 | 78 | 613-07001 | Type One Pull Box | 40.00 | EA | $ ____________ | $ ____________ |
84 | 79 | 613-07040 | Pull Box (30"x48"x24") (broadband) | 18.00 | EA | $ ____________ | $ ____________ |
85 | 81 | 613-10000 | Wiring | 1.00 | LS | $ ____________ | $ ____________ |
86 | 83 | 613-40012 | Light Standard Foundation (Special) | 39.00 | EA | $ ____________ | $ ____________ |
87 | 84 | 613-501106 | Lighting Control Center (special) | 1.00 | EA | $ ____________ | $ ____________ |
88 | 85 | 614-01503 | Steel Sign Support (2" Round) (Post & Socket) | 6.00 | EA | $ ____________ | $ ____________ |
89 | 86 | 619-40120 | 1-1/2 Inch Copper Pipe | 40.00 | LF | $ ____________ | $ ____________ |
90 | 87 | 619-50080 | 1 Inch Plastic Pipe | 3,080.00 | LF | $ ____________ | $ ____________ |
91 | 88 | 619-50100 | 1-1/4 Inch Plastic Pipe | 10.00 | LF | $ ____________ | $ ____________ |
92 | 89 | 619-50160 | 2 Inch Plastic Pipe (CL200) | 3,100.00 | LF | $ ____________ | $ ____________ |
93 | 90 | 619-50160 | 2 Inch Plastic Pipe (SCH40 PVC Sleeve) | 2,560.00 | LF | $ ____________ | $ ____________ |
94 | 91 | 620-00020 | Sanitary Facility | 1.00 | EA | $ ____________ | $ ____________ |
95 | 92 | 621-00650 | Pedestrian Stair Structure | 1.00 | LS | $ ____________ | $ ____________ |
96 | 96 | 623-00156 | Irrigation Bubbler | 216.00 | EA | $ ____________ | $ ____________ |
97 | 97 | 623-00162 | Drip Emitter Tubing | 2,440.00 | LF | $ ____________ | $ ____________ |
98 | 98 | 623-00164 | Drip Emitter | 400.00 | EA | $ ____________ | $ ____________ |
99 | 99 | 623-00166 | 3/4 Inch Emitter Valve Assembly | 14.00 | EA | $ ____________ | $ ____________ |
100 | 100 | 623-00602 | 2 Inch Plastic Pipe (Irrigation/Sleeve) | 830.00 | LF | $ ____________ | $ ____________ |
101 | 101 | 623-00604 | 4 Inch Plastic Pipe (Irrigation/Sleeve) | 590.00 | LF | $ ____________ | $ ____________ |
102 | 102 | 623-01712 | 1-1/2 Inch Backflow Preventer | 1.00 | EA | $ ____________ | $ ____________ |
103 | 103 | 623-02006 | 3/4 Inch Drain Valve | 3.00 | EA | $ ____________ | $ ____________ |
104 | 104 | 623-03108 | 1 Inch Automatic Control Valve | 14.00 | EA | $ ____________ | $ ____________ |
---|---|---|---|---|---|---|---|
105 | 105 | 623-03116 | 1 1/2 Inch Automatic Control Valve (Master Control) | 1.00 | EA | $ ____________ | $ ____________ |
106 | 106 | 623-04000 | Control Wire 24 Volt | 15,000.00 | LF | $ ____________ | $ ____________ |
107 | 107 | 623-04000 | Control Wire 24 Volt | 5,000.00 | LF | $ ____________ | $ ____________ |
108 | 108 | 623-04002 | Power Source Wire | 20.00 | LF | $ ____________ | $ ____________ |
109 | 109 | 623-04008 | 1 Inch Quick-Coupler Valve | 3.00 | EA | $ ____________ | $ ____________ |
110 | 110 | 623-05016 | 2 Inch Gate Valve | 4.00 | EA | $ ____________ | $ ____________ |
111 | 111 | 623-06900 | Valve Box | 16.00 | EA | $ ____________ | $ ____________ |
112 | 112 | 623-06900 | Valve Box | 23.00 | EA | $ ____________ | $ ____________ |
113 | 113 | 623-06901 | Valve Box (Special) | 14.00 | EA | $ ____________ | $ ____________ |
114 | 114 | 623-07510 | Weather Station | 1.00 | EA | $ ____________ | $ ____________ |
115 | 115 | 623-07600 | 1 1/2 Inch Flow Sensor | 1.00 | EA | $ ____________ | $ ____________ |
116 | 116 | 623-08432 | 40 Station Automatic Controller | 1.00 | EA | $ ____________ | $ ____________ |
117 | 117 | 623-xxxxx | 1/4" Distribution Pipe | 1,000.00 | LF | $ ____________ | $ ____________ |
118 | 118 | 623-xxxxx | Drip Line Blow-Out | 12.00 | EA | $ ____________ | $ ____________ |
119 | 119 | 625-00000 | Construction Surveying | 1.00 | LS | $ ____________ | $ ____________ |
120 | 120 | 626-00000 | Mobilization | 1.00 | LS | $ ____________ | $ ____________ |
121 | 121 | 627-00001 | Pavement Marking Paint | 6.20 | GAL | $ ____________ | $ ____________ |
122 | 122 | 627-30405 | Preformed Thermoplastic Pavement Marking (Right Turn Arrow) | 48.00 | SF | $ ____________ | $ ____________ |
123 | 123 | 627-30405 | Preformed Thermoplastic Pavement Marking (Accessibility Parking) | 64.00 | SF | $ ____________ | $ ____________ |
124 | 124 | 630-00000 | Flagging | 330.00 | HOUR | $ ____________ | $ ____________ |
125 | 125 | 630-00007 | Traffic Control Inspection | 34.00 | DAYS | $ ____________ | $ ____________ |
126 | 126 | 630-00012 | Traffic Control Management | 64.00 | DAYS | $ ____________ | $ ____________ |
127 | 127 | 630-80341 | Construction Traffic Sign (Panel Size A) | 22.00 | EA | $ ____________ | $ ____________ |
128 | 128 | 630-80342 | Construction Traffic Sign (Panel Size B) | 16.00 | EA | $ ____________ | $ ____________ |
129 | 129 | 630-80344 | Construction Sign Panel (Special) | 21.00 | SF | $ ____________ | $ ____________ |
130 | 130 | 630-80336 | Barricade (Type 3 M-B)(Temporary) | 10.00 | EA | $ ____________ | $ ____________ |
131 | 131 | 630-80358 | Advanced Warning Flashing Arrow (type C) | 150.00 | DAYS | $ ____________ | $ ____________ |
132 | 132 | 630-80359 | Portable Message Sign Panel | 36.00 | DAYS | $ ____________ | $ ____________ |
133 | 133 | 630-80360 | Drum Channelizing Device | 80.00 | EA | $ ____________ | $ ____________ |
134 | 134 | 630-80363 | Drum Channelizing Device (With Light) (Flashing) | 80.00 | EA | $ ____________ | $ ____________ |
135 | 135 | 630-80377 | Portable Water Filled Barrier (Temporary) | 50.00 | LF | $ ____________ | $ ____________ |
136 | 136 | 630-80380 | Traffic Cone | 160.00 | EA | $ ____________ | $ ____________ |
137 | 137 | 630 | Public Information Services | 1.00 | LS | $ ____________ | $ ____________ |
194 | 138 | 700-70011 | Partnering Program | 1.00 | FA | $ 150.00 | $ 150.00 |
195 | 139 | 700-70016 | Fuel Cost Adjustment | 1.00 | FA | $ 6,600.00 | $ 6,600.00 |
196 | 140 | 700-70021 | On the Job Trainee | 192.00 | HOUR | $ 2.50 | $ 480.00 |
197 | 141 | 700-70320 | Sprinklers | 1.00 | FA | $ 3,900.00 | $ 3,900.00 |
198 | 142 | 700-70380 | Erosion Control | 1.00 | FA | $ 1,800.00 | $ 1,800.00 |
199 | 143 | 700-73302 | Lighting by Others (Non-Utility) | 1.00 | FA | $ 6,000.00 | $ 6,000.00 |
200 | MCR |
Minor Contract Revisions |
- - - | - - - | - - - | $ 45,000.00 | |
201 | Base Project Bid Amount: | $ | 63,930.00 | ||||
203 | Bid Amount: | ||||||
204 | dollars |
A | B | C | D | E | F | G | |
---|---|---|---|---|---|---|---|
1 | Bid Schedule | ||||||
2 | NORTH AVENUE COMPLETE STREETS (12th Street to 23rd Street) | ||||||
3 | IFB-4156-16-DH | ||||||
5 | Company: | ||||||
7 | Add Alternate 1 - Median Improvements | ||||||
8 | Item No. | CDOT, City Ref. | Description | Quantity | Units | Unit Price | Total Price |
10 | 1 | 201-00000 | Clearing and Grubbing | 0.10 | AC | $ ____________ | $ ____________ |
11 | 3 | 202-00010 | Removal of Tree | 1.00 | EA | $ ____________ | $ ____________ |
12 | 7 | 202-00190 | Removal of Concrete Median Cover Material | 648.00 | SY | $ ____________ | $ ____________ |
13 | 8 | 202-00195 | Removal of Median Cover | 1,378.00 | SY | $ ____________ | $ ____________ |
14 | 10 | 202-00201 | Removal of Curb | 794.00 | LF | $ ____________ | $ ____________ |
15 | 15 | 202-00220 | Removal of Asphalt Mat | 133.00 | SY | $ ____________ | $ ____________ |
16 | 19 | 203-00010 | Unclassified Excavation (CIP) | 41.00 | CY | $ ____________ | $ ____________ |
17 | 20 | 203-01597 | Potholing | 8.00 | HOUR | $ ____________ | $ ____________ |
18 | 21 | 203-01622 | Sweeping | 6.00 | HOUR | $ ____________ | $ ____________ |
19 | 22 | 207-00210 | Stockpile Topsoil | 120.00 | CY | $ ____________ | $ ____________ |
20 | 23 | 208-00035 | Aggregate Bag | 2.00 | LF | $ ____________ | $ ____________ |
21 | 24 | 208-00045 | Concrete Washout Structure | 1.00 | EA | $ ____________ | $ ____________ |
22 | 25 | 208-00052 | Storm Drain Inlet Protection (Type 2) | 25.00 | LF | $ ____________ | $ ____________ |
23 | 26 | 208-00070 | Vehicle Tracking Pad | 1.00 | EA | $ ____________ | $ ____________ |
24 | 27 | 208-00103 | Removal and Disposal of Sediment (Labor) | 8.00 | HOUR | $ ____________ | $ ____________ |
25 | 28 | 208-00105 | Removal and Disposal of Sediment (Equipment) | 8.00 | HOUR | $ ____________ | $ ____________ |
26 | 29 | 208-00206 | Erosion Control Supervisor | 24.00 | DAY | $ ____________ | $ ____________ |
27 | 34 | 210-00827 | Reset Pull Box | 8.00 | EA | $ ____________ | $ ____________ |
28 | 39 | 210-04050 | Adjust Valve Box | 5.00 | EA | $ ____________ | $ ____________ |
29 | 41 | 212-00032 | Soil Conditioning | 0.48 | AC | $ ____________ | $ ____________ |
30 | 42 | 207-00205 | Topsoil | 1,568.00 | CY | $ ____________ | $ ____________ |
31 | 45 | 213-00065 | Inorganic Mulch | 197.00 | CY | $ ____________ | $ ____________ |
32 | 48 | 214-00230 | Deciduous Tree (3 Inch Caliper) | 34.00 | EA | $ ____________ | $ ____________ |
33 | 49 | 214-00350 | Deciduous Shrub (5 Gallon Container) | 146.00 | EA | $ ____________ | $ ____________ |
34 | 50 | 214-00910 | Perennials (1 Gallon Container) | 85.00 | EA | $ ____________ | $ ____________ |
35 | 51 | 304-06000 | Aggregate Base Course (CL 6) | 130.00 | TON | $ ____________ | $ ____________ |
36 | 70 | 609-20010 | Curb Type 2 (Section B) | 692.00 | LF | $ ____________ | $ ____________ |
37 | 74 | 610-00020 | Median Cover Material (Patterned Concrete) | 3,511.00 | SF | $ ____________ | $ ____________ |
38 | 87 | 619-50080 | 1 Inch Plastic Pipe | 2,000.00 | LF | $ ____________ | $ ____________ |
39 | 88 | 619-50100 | 1-1/4 Inch Plastic Pipe | 120.00 | LF | $ ____________ | $ ____________ |
40 | 91 | 620-00020 | Sanitary Facility | 1.00 | EA | $ ____________ | $ ____________ |
41 | 96 | 623-00156 | Irrigation Bubbler | 168.00 | EA | $ ____________ | $ ____________ |
42 | 97 | 623-00162 | Drip Emitter Tubing | 1,420.00 | LF | $ ____________ | $ ____________ |
43 | 98 | 623-00164 | Drip Emitter | 300.00 | EA | $ ____________ | $ ____________ |
44 | 100 | 623-00602 | 2 Inch Plastic Pipe (Irrigation/Sleeve) | 1,220.00 | LF | $ ____________ | $ ____________ |
45 | 101 | 623-00604 | 4 Inch Plastic Pipe (Irrigation/Sleeve) | 580.00 | LF | $ ____________ | $ ____________ |
46 | 112 | 623-06900 | Valve Box | 11.00 | EA | $ ____________ | $ ____________ |
47 | 117 | 623-xxxxx | 1/4" Distribution Pipe | 500.00 | LF | $ ____________ | $ ____________ |
48 | 118 | 623-xxxxx | Drip Line Blow-Out | 14.00 | EA | $ ____________ | $ ____________ |
49 | 119 | 625-00000 | Construction Surveying | 1.00 | LS | $ ____________ | $ ____________ |
50 | 120 | 626-00000 | Mobilization | 1.00 | LS | $ ____________ | $ ____________ |
51 | 124 | 630-00000 | Flagging | 85.00 | HOUR | $ ____________ | $ ____________ |
52 | 125 | 630-00007 | Traffic Control Inspection | 10.00 | DAYS | $ ____________ | $ ____________ |
53 | 126 | 630-00012 | Traffic Control Management | 16.00 | DAYS | $ ____________ | $ ____________ |
54 | 131 | 630-80358 | Advanced Warning Flashing Arrow (type C) | 50.00 | DAYS | $ ____________ | $ ____________ |
---|---|---|---|---|---|---|---|
55 | 132 | 630-80359 | Portable Message Sign Panel | 12.00 | DAYS | $ ____________ | $ ____________ |
56 | 137 | 630 | Public Information Services | 1.00 | LS | $ ____________ | $ ____________ |
57 | 138 | 700-70011 | Partnering Program | 1.00 | FA | $ 50.00 | $ 50.00 |
58 | 139 | 700-70016 | Fuel Cost Adjustment | 1.00 | FA | $ 200.00 | $ 200.00 |
59 | 140 | 700-70021 | On the Job Trainee | 64.00 | HOUR | $ 2.50 | $ 160.00 |
60 | 141 | 700-70320 | Sprinklers | 1.00 | FA | $ 1,300.00 | $ 1,300.00 |
61 | 142 | 700-70380 | Erosion Control | 1.00 | FA | $ 600.00 | $ 600.00 |
62 | 143 | 700-73302 | Lighting by Others (Non-Utility) | 1.00 | FA | $ 2,000.00 | $ 2,000.00 |
63 | MCR |
Minor Contract Revisions |
- - - | - - - | - - - | $ 15,000.00 | |
64 | Add Alternate 1 Bid Amount: | $ | 19,310.00 | ||||
66 | Bid Amount: | ||||||
67 | dollars |
A | B | C | D | E | F | G | ||
---|---|---|---|---|---|---|---|---|
1 | Bid Schedule | |||||||
2 | NORTH AVENUE COMPLETE STREETS (12th Street to 23rd Street) | |||||||
3 | IFB-4156-16-DH | |||||||
5 | Company: | Company: | ||||||
7 | Add Alternate 2 - South Side Improvements | |||||||
8 | Item No. | CDOT, City Ref. | Description | Quantity | Units | Unit Price | Total Price | |
10 | 1 | 201-00000 | Clearing and Grubbing | 0.56 | AC | $ ____________ | $ ____________ | |
11 | 3 | 202-00010 | Removal of Tree | 6.00 | EA | $ ____________ | $ ____________ | |
12 | 9 | 202-00200 | Removal of Sidewalk | 765.00 | SY | $ ____________ | $ ____________ | |
13 | 12 | 202-00203 | Removal of Curb and Gutter | 639.00 | LF | $ ____________ | $ ____________ | |
14 | 13 | 202-00206 | Removal of Concrete Curb Ramp | 5.00 | SY | $ ____________ | $ ____________ | |
15 | 19 | 203-00010 | Unclassified Excavation (CIP) | 166.00 | CY | $ ____________ | $ ____________ | |
16 | 20 | 203-01597 | Potholing | 8.00 | HOUR | $ ____________ | $ ____________ | |
17 | 21 | 203-01622 | Sweeping | 6.00 | HOUR | $ ____________ | $ ____________ | |
18 | 22 | 207-00210 | Stockpile Topsoil | 1,100.00 | CY | $ ____________ | $ ____________ | |
19 | 23 | 208-00035 | Aggregate Bag | 2.00 | LF | $ ____________ | $ ____________ | |
20 | 24 | 208-00045 | Concrete Washout Structure | 1.00 | EA | $ ____________ | $ ____________ | |
21 | 25 | 208-00052 | Storm Drain Inlet Protection (Type 2) | 25.00 | LF | $ ____________ | $ ____________ | |
22 | 26 | 208-00070 | Vehicle Tracking Pad | 1.00 | EA | $ ____________ | $ ____________ | |
23 | 27 | 208-00103 | Removal and Disposal of Sediment (Labor) | 8.00 | HOUR | $ ____________ | $ ____________ | |
24 | 28 | 208-00105 | Removal and Disposal of Sediment (Equipment) | 8.00 | HOUR | $ ____________ | $ ____________ | |
25 | 29 | 208-00206 | Erosion Control Supervisor | 24.00 | DAY | $ ____________ | $ ____________ | |
26 | 33 | 210-00815 | Reset Sign Panel | 3.00 | EA | $ ____________ | $ ____________ | |
27 | 35 | 210-01000 | Reset Fence | 1,786.00 | LF | $ ____________ | $ ____________ | |
28 | 36 | 210-01000 | Reset Fence (Special) (Safety Screen) | 565.00 | LF | $ ____________ | $ ____________ | |
29 | 37 | 210-04010 | Adjust Manhole | 1.00 | EA | $ ____________ | $ ____________ | |
30 | 41 | 212-00032 | Soil Conditioning | 0.01 | AC | $ ____________ | $ ____________ | |
31 | 42 | 207-00205 | Topsoil | 29.00 | CY | $ ____________ | $ ____________ | |
32 | 43 | 212-00011 | Seeding Lawn | 0.54 | AC | $ ____________ | $ ____________ | |
33 | 44 | 212-00040 | Soil Preparation Lawn | 0.54 | AC | $ ____________ | $ ____________ | |
34 | 47 | 214-00145 | Plant Protection Fence | 1,820.00 | LF | $ ____________ | $ ____________ | |
35 | 48 | 214-00230 | Deciduous Tree (3 Inch Caliper) | 16.00 | EA | $ ____________ | $ ____________ | |
36 | 51 | 304-06000 | Aggregate Base Course (CL 6) | 364.00 | TON | $ ____________ | $ ____________ | |
37 | 67 | 608-00006 | Concrete Sidewalk (6 Inch) | 1,637.00 | SY | $ ____________ | $ ____________ | |
38 | 68 | 608-00010 | Concrete Curb Ramp | 2.00 | SY | $ ____________ | $ ____________ | |
39 | 72 | 609-21020 | Curb and Gutter Type 2 (Section II-B) | 450.00 | LF | $ ____________ | $ ____________ | |
40 | 75 | 613-01200 | 2 inch Electrical Conduit | 4,015.00 | LF | $ ____________ | $ ____________ | |
41 | 77 | 613-04010 | Conduit (2" City Traffic) | 3,700.00 | LF | $ ____________ | $ ____________ | |
42 | 78 | 613-07001 | Type One Pull Box | 38.00 | EA | $ ____________ | $ ____________ | |
43 | 80 | 613-07040 | Pull Box (30"x48"x24") (city Traffic) | 7.00 | EA | $ ____________ | $ ____________ | |
44 | 81 | 613-10000 | Wiring | 1.00 | LS | $ ____________ | $ ____________ | |
45 | 83 | 613-40012 | Light Standard Foundation (Special) | 37.00 | EA | $ ____________ | $ ____________ | |
46 | 85 | 614-01503 | Steel Sign Support (2" Round) (Post & Socket) | 3.00 | EA | $ ____________ | $ ____________ | |
47 | 91 | 620-00020 | Sanitary Facility | 1.00 | EA | $ ____________ | $ ____________ | |
48 | 119 | 625-00000 | Construction Surveying | 1.00 | LS | $ ____________ | $ ____________ | |
49 | 120 | 626-00000 | Mobilization | 1.00 | LS | $ ____________ | $ ____________ | |
50 | 124 | 630-00000 | Flagging | 85.00 | HOUR | $ ____________ | $ ____________ | |
51 | 125 | 630-00007 | Traffic Control Inspection | 10.00 | DAYS | $ ____________ | $ ____________ | |
52 | 126 | 630-00012 | Traffic Control Management | 16.00 | DAYS | $ ____________ | $ ____________ | |
53 | 131 | 630-80358 | Advanced Warning Flashing Arrow (type C) | 50.00 | DAYS | $ ____________ | $ ____________ |
54 | 132 | 630-80359 | Portable Message Sign Panel | 12.00 | DAYS | $ ____________ | $ ____________ |
---|---|---|---|---|---|---|---|
55 | 137 | 630 | Public Information Services | 1.00 | LS | $ ____________ | $ ____________ |
56 | 138 | 700-70011 | Partnering Program | 1.00 | FA | $ 50.00 | $ 50.00 |
57 | 139 | 700-70016 | Fuel Cost Adjustment | 1.00 | FA | $ 200.00 | $ 200.00 |
58 | 140 | 700-70021 | On the Job Trainee | 64.00 | HOUR | $ 2.50 | $ 160.00 |
59 | 141 | 700-70320 | Sprinklers | 1.00 | FA | $ 1,300.00 | $ 1,300.00 |
60 | 142 | 700-70380 | Erosion Control | 1.00 | FA | $ 600.00 | $ 600.00 |
61 | 143 | 700-73302 | Lighting by Others (Non-Utility) | 1.00 | FA | $ 2,000.00 | $ 2,000.00 |
62 | MCR |
Minor Contract Revisions |
- - - | - - - | - - - | $ 15,000.00 | |
63 | Add Alternate 2 Bid Amount: | $ | 19,310.00 | ||||
65 | Bid Amount: | ||||||
66 | dollars |
A | B | C | D | E | F | G | ||
---|---|---|---|---|---|---|---|---|
1 | Bid Schedule | |||||||
2 | NORTH AVENUE COMPLETE STREETS (12th Street to 23rd Street) | |||||||
3 | IFB-4156-16-DH | |||||||
5 | Company: | Company: | ||||||
7 | Add Alternate 3 - Furnishings | |||||||
8 | Item No. | CDOT, City Ref. | Description | Quantity | Units | Unit Price | Total Price | |
10 | 93 | 622-00010 | Bicycle Rack | 6.00 | EA | $ ____________ | $ ____________ | |
11 | 94 | 622-00250 | Bench | 19.00 | EA | $ ____________ | $ ____________ | |
12 | 95 | 622-00350 | Trash Receptacle | 18.00 | EA | $ ____________ | $ ____________ | |
13 | MCR |
Minor Contract Revisions |
- - - | - - - | - - - | $ - | ||
14 | Add Alternate 3 Bid Amount: | $ | 0.00 |
A | B | C | D | E | |
---|---|---|---|---|---|
1 | Bid Schedule Summary: | ||||
2 | NORTH AVENUE COMPLETE STREETS (12th Street to 23rd Street) | ||||
3 | IFB-4156-16-DH | ||||
5 | Company: | ||||
8 | Bid Schedule | Description | Bid Amount | DBE Commitment Amount | % DBE Commitment |
9 | Base Project | North Side and VA Improvements | $ 63,930.00 | $ ____________ | |
10 | Add Alternate 1 | Median Improvements | $ 19,310.00 | $ ____________ | |
11 | Add Alternate 2 | South Side Improvements | $ 19,310.00 | $ ____________ | |
12 | Add Alternate 3 | Furnishings | $ - | $ ____________ | |
15 | Priority | Scenario | Bid Amount | Weighted DBE % | |
16 | 1 | Base+Add Alt 1+Add Alt 2+Add Alt 3 | $ 102,550.00 | ||
17 | 2 | Base+Add Alt 1+Add Alt 2 | $ 102,550.00 | ||
18 | 3 | Base+Add Alt 2+Add Alt 3 | $ 83,240.00 | ||
19 | 4 | Base+Add Alt 1 | $ 83,240.00 | ||
20 | 5 | Base+Add Alt 2 | $ 83,240.00 | ||
21 | 6 | Base Project Only | $ 63,930.00 | ||
23 | Note: | ||||
24 | Two combinations of schedules are not shown in the prioritized list above. These are Base+Add Alt 3 and Base+Add Alt 1+Add Alt 3. These were not included since the furnishings are proposed on both north and south sides of the roadway and it would not be reasonable to construction Add Alt 3 without completing the improvements in Add Alt 2. | ||||
25 | |||||
26 | |||||
27 |