A |
B |
C |
D |
E |
F |
G |
---|
1 |
Bid Schedule: 1st Street Reconstruction |
2 |
Company Name:_______________________ |
Addendum #2 |
4 |
Item No. |
CDOT, City Ref. |
Description |
Quantity |
Units |
Unit Price |
Total Price |
7 |
1 |
108.2 |
8" Storm Drain Pipe (RCP)
|
10.00 |
LF |
|
$ - |
8 |
2 |
108.2 |
12" Storm Drain Pipe (RCP)
|
358.00 |
LF |
|
$ - |
9 |
3 |
108.2 |
30" Storm Drain Pipe (RCP)
|
5.00 |
LF |
|
$ - |
10 |
4 |
108.2 |
42" Storm Drain Pipe (RCP)
|
406.00 |
LF |
|
$ - |
11 |
5 |
108.5 |
Connect to Existing Manhole
|
4.00 |
EA |
|
$ - |
12 |
6 |
108.5 |
Adjust storm Manhole Rim to Finish Grade (Replace ring and cover
with Watertight)
|
2.00 |
EA |
|
$ - |
13 |
7 |
108.6 |
Storm Sewer Basic Manhole (48" I.D.)
|
1.00 |
EA |
|
$ - |
14 |
8 |
108.6 |
Storm Manhole Cast in place Base (48" I.D.)(E1-232-014 total height
11.9 feet and D4252-031 total height 15 feet)(Price to include
vertical height of 48" Barrel section manhole)
|
2.00 |
EA |
|
$ - |
15 |
9 |
108.6 |
Storm Manhole Drop (E1-231-014A)(total height 9.95 Feet)
|
1.00 |
EA |
|
$ - |
16 |
10 |
108.6 |
Single Storm Drain Inlet (Large Area Inlet)
|
9.00 |
EA |
|
$ - |
17 |
11 |
108.6 |
Single Storm Drain Inlet (Vertical Curb) |
3.00 |
EA |
|
$ - |
18 |
12 |
202 |
Removal of Asphalt Mat (Milling)(1"-8")
|
18,150.00 |
SY |
|
$ - |
19 |
13 |
202 |
Removal of concrete. Remove concrete as shown* indicated by cross
hatch pattern(includes but not limited to Saw Cutting, curb,
gutter, sidewalks, driveways slabs v-pans, curb ramps, intersection
corners and aprons)
|
2,711.00 |
SY |
|
$ - |
20 |
14 |
202 |
Remove Tree
|
9.00 |
EA |
|
$ - |
21 |
15 |
202 |
Removal of Bush
|
43.00 |
EA |
|
$ - |
22 |
16 |
202 |
Removal of Sod
|
4,900.00 |
SF |
|
$ - |
23 |
17 |
202 |
Removal of Manhole (Storm)
|
2.00 |
EA |
|
$ - |
24 |
18 |
202 |
Removal of Inlet
|
8.00 |
EA |
|
$ - |
25 |
19 |
202 |
Removal of Ground Sign
|
1.00 |
EA |
|
$ - |
26 |
20 |
202 |
Removal of Pipe (12" and Smaller)
|
305.00 |
LF |
|
$ - |
27 |
21 |
202 |
Removal of Pipe (18" and Larger)
|
75.00 |
LF |
|
$ - |
28 |
22 |
202 |
Abandon Pipe by plugging Open end
|
2.00 |
EA |
|
$ - |
29 |
23 |
202 |
Removal of wood boarder
|
171.00 |
LF |
|
$ - |
30 |
24 |
202 |
Removal of Parking Chalks
|
4.00 |
EA |
|
$ - |
31 |
25 |
202 |
Removal of Fence
|
64.00 |
LF |
|
$ - |
32 |
26 |
202 |
Remove post
|
7.00 |
EA |
|
$ - |
33 |
27 |
202 |
Remove buisness sign base (901 and 935 N 1st St and 2582 HWY 6
& 50)
|
5.00 |
EA |
|
$ - |
34 |
28 |
202 |
Remove Pole Foundation
|
1.00 |
EA |
|
$ - |
35 |
29 |
202 |
Remove Light Pole
|
2.00 |
EA |
|
$ - |
36 |
30 |
203 |
Potholing
|
Lump |
sum |
|
$ - |
37 |
31 |
203 |
Unclassified Excavation
|
13,658.00 |
CY |
|
$ - |
38 |
32 |
203 |
Sweeping with Pick-up Broom
|
70.00 |
HR |
|
$ - |
39 |
33 |
203 |
Disposal of Radioctive Materials
|
250.00 |
CY |
|
$ - |
40 |
34 |
206 |
Structural Backfill (Flowfill)(as Required)
|
100.00 |
CY |
|
$ - |
41 |
35 |
208 |
Storm Drain Inlet Protection
|
14.00 |
EA |
|
$ - |
42 |
36 |
208 |
Concrete Washout Facility
|
4.00 |
EA |
|
$ - |
43 |
37 |
208 |
Vehical track Pad
|
4.00 |
EA |
|
$ - |
44 |
38 |
208 |
Erosion Control (Complete In Place)
|
Lump |
sum |
|
$ - |
45 |
39 |
209 |
Dust Abatement
|
120.00 |
Day |
|
$ - |
46 |
40 |
210 |
Reset Sprinkler System ( Complete in Place)
|
6.00 |
EA |
|
$ - |
47 |
41 |
210 |
Reset Sign Panel
|
21.00 |
EA |
|
$ - |
48 |
42 |
210 |
Adjust Water Valve to Finish Grade
|
20.00 |
EA |
|
$ - |
49 |
43 |
210 |
Reset Fire Hydrant
|
1.00 |
EA |
|
$ - |
50 |
44 |
210 |
Adjust Water meter to Finished Grade
|
27.00 |
EA |
|
$ - |
51 |
45 |
210 |
Rest Backflow Preventor
|
3.00 |
EA |
|
$ - |
52 |
46 |
210 |
Temporary Sidewalk
|
100.00 |
LF |
|
$ - |
53 |
47 |
210 |
Adjust Manhole to Finished Grade
|
10.00 |
EA |
|
$ - |
|
|
|
|
|
|
|
|
---|
54 |
48 |
210 |
Adjust SSCO to Finished Grade
|
23.00 |
EA |
|
$ - |
55 |
49 |
210 |
Reset Parking Blocks
|
6.00 |
EA |
|
$ - |
56 |
50 |
210 |
Reset Business (Sign) (Price to include new Base)
|
2.00 |
EA |
|
$ - |
57 |
51 |
210 |
Reference and Reset Monitoring Well Covers(Protect Monitoring
Well in Place)
|
9.00 |
EA |
|
$ - |
58 |
52 |
212 |
Sod (Behind BOW to restore sodded areas
|
2,205.00 |
SF |
|
$ - |
59 |
53 |
213 |
Inorganic mulch (behind BOW to restore Xericscape or gravel driveway)(4"
Deep)
|
17.00 |
CY |
|
$ - |
60 |
54 |
304 |
Subgrade Stabilization (Class 3 ABC)14" Thick(Road Prism)(1st
Street) |
10,400.00 |
SY |
|
$ - |
61 |
55 |
304 |
Aggregate Base Course (Class 6)(12" Thick)(1st St and North Ave)
|
10,700.00 |
SY |
|
$ - |
62 |
56 |
304 |
Aggregate Base Course (Class 6)(6" thick) (Paving behind BOW to
Restore Driveways and parking)(FOR HMA ONLY)
|
1,150.00 |
SY |
|
$ - |
63 |
57 |
304 |
Aggregate Base Course (Class 6)(12" Thick)(Connector Roads)
|
1,250.00 |
SY |
|
$ - |
64 |
58 |
401 |
Hot Mix Asphalt (3" Thick)(Gradin SX-75)(Binder 64-22)(Bottom
Mat Connector Roads)
|
10,700.00 |
SY |
|
$ - |
65 |
59 |
401 |
Hot Mix Asphalt (2" Thick)(Gradin SX-75)(Binder 76-28)(Top Mat
Connector Roads)
|
10,700.00 |
SY |
|
$ - |
66 |
60 |
401 |
Hot Mix Asphalt (3" Thick)(Gradin SX-75)(Binder 64-22)(Bottom
Mat Connector Roads)
|
1,250.00 |
SY |
|
$ - |
67 |
61 |
401 |
Hot Mix Asphalt (2" Thick)(Gradin SX-75)(Binder 76-28)(Top Mat
Connector Roads)
|
1,250.00 |
SY |
|
$ - |
68 |
62 |
401 |
Hot Mix Asphalt (2" Thick) (Overlay Fuoco DWY)
|
800.00 |
SY |
|
$ - |
69 |
63 |
401 |
Hot Mix Asphalt Grade Transition from Back of Curb to Existing
Pavement Grade (Grading SX-75)(Binder 64-22)(Fuoco Driveway)
|
35.00 |
TON |
|
$ - |
70 |
64 |
401 |
Hot Mix Asphalt (4" Thick) (Grading SX-75)(Binder 64-22)(2ea 2"Lifts)(Paving
Behind Back of Walk to restore Drives and Parking)
|
1,150.00 |
SY |
|
$ - |
71 |
65 |
412 |
Colored Concrete Pavement (Parking)(Class D)(8" Thick) (Omaha
Tan)(Davis Color 5084)(Price to Include 4" Class 6 Aggregate
Base Course)
|
1,190.00 |
SY |
|
$ - |
72 |
66 |
412 |
Concrete Pavement (Alley)(Class D)(8" Thick)(Price to Include
4" Class 6 Aggregate Base Course)
|
250.00 |
SY |
|
$ - |
73 |
67 |
412 |
Concrete Pavement (Paving Behind Back of Walk to restore Drives
and Parking)(Class D)(6" Thick)(Price to Include 4" Class 6 Aggregate
Base Course)
|
65.00 |
SY |
|
$ - |
74 |
68 |
420 |
Geogrid (TriAxial)
|
1,000.00 |
SY |
|
$ - |
75 |
69 |
608 |
Concrete Drainage Pan (1.5' Wide)
|
5.00 |
LF |
|
$ - |
76 |
70 |
608 |
Concrete Drainage Pan (3' Wide)
|
35.00 |
LF |
|
$ - |
77 |
71 |
608 |
Concrete Drainage Pan (6' Wide)
|
180.00 |
LF |
|
$ - |
78 |
72 |
608 |
Concrete Curb ( 6" wide)
|
2,090.00 |
LF |
|
$ - |
79 |
73 |
608 |
Concrete Curb with Spill Gutter (1.5' Wide)
|
510.00 |
LF |
|
$ - |
80 |
74 |
608 |
Concrete Curb and Gutter (2' Wide)
|
1,350.00 |
LF |
|
$ - |
81 |
75 |
608 |
Concrete Curb and Gutter (2.5' Wide)
|
25.00 |
LF |
|
$ - |
82 |
76 |
608 |
Concrete Drive Over Curb and Gutter ( 3' Wide)
|
470.00 |
LF |
|
$ - |
83 |
77 |
608 |
Concrete Sidewalk ( 4" Thick)
|
2,710.00 |
SY |
|
$ - |
84 |
78 |
608 |
Monolithic Curb Gutter and Sidewalk (7' Wide)
|
25.00 |
SY |
|
$ - |
85 |
79 |
608 |
Monolithic Curb Gutter and Sidewalk (10' Wide)
|
300.00 |
SY |
|
$ - |
86 |
80 |
608 |
Concrete Curb Ramp (8" thick)
|
255.00 |
SY |
|
$ - |
87 |
81 |
608 |
Concrete Driveway Section ( 8" Thick)
|
1,690.00 |
SY |
|
$ - |
88 |
82 |
608 |
Concrete Intersection Corner
|
340.00 |
SY |
|
$ - |
89 |
83 |
608 |
Concrete Median Edgeing 1.5' Wide(Sunset Rose)(Davis Color 160)
|
410.00 |
LF |
|
$ - |
90 |
84 |
608 |
Detectable Warning (Wet Set) (2'X2")
|
65.00 |
EA |
|
$ - |
91 |
85 |
613 |
Large Splice Box (Quasite 24X36)(Labled "FIBER")
|
8.00 |
EA |
|
$ - |
92 |
86 |
613 |
Splice Box (Quasite 13X24X15)(Labled "Fiber")
|
8.00 |
EA |
|
$ - |
93 |
87 |
613 |
Large Splice Box (48" Manhole Cone Section on Blocks)(Price to
include Manhole Ring and Cover labled "TRAFFIC")
|
7.00 |
EA |
|
$ - |
94 |
88 |
613 |
6" Diameter SCH 80 PVC Conduit Duct (With a standard 8KN pull
rope pre installed and #10 tracing wire)(to be installed in common
trench)
|
2,500.00 |
LF |
|
$ - |
95 |
89 |
613 |
2" Diameter SCH 80 PVC Conduit Duct (With a standard 8KN pull
rope pre installed and #10 tracing wire)(to be installed in common
trench)
|
4,300.00 |
LF |
|
$ - |
96 |
90 |
613 |
Electrical Utility Trech (24" Wide X 30" Deep) (Including Backfill
Material Per Special Provisions)
|
2,500.00 |
LF |
|
$ - |
97 |
91 |
620 |
Sanitary Facility
|
Lump |
sum |
|
$ - |
98 |
92 |
625 |
Construction Surveying
|
Lump |
sum |
|
$ - |
99 |
93 |
626 |
Mobilization
|
Lump |
sum |
|
$ - |
100 |
94 |
627 |
Preformed Thermoplastic Pavement Markings (Word Symbol)
|
360.00 |
SF |
|
$ - |
101 |
95 |
627 |
Preformed Thermoplastic Pavement Markings (X-Walk/Stop Bar)
|
2,200.00 |
SF |
|
$ - |
102 |
96 |
629 |
Reference and Reset Survey Monuments
|
7.00 |
EA |
|
$ - |
103 |
97 |
629 |
Set Property Pin Per Legal Description
|
19.00 |
EA |
|
$ - |